Ripping off the existance ceiling. (the ceiling was made from cement board)
Still ripping off the ceiling. It takes the whole morning to complete.
Done by 2 person one below (holding) and one above knocking down the ceiling.
Starting fixing for the lower ceiling.
(picture above and below)