Home
BMobile
Simpur
RBA'S FLIGHT
eBay
Liat Youtube?
Empire Hotel
Share
Welcome 2 my humble page...
...best viwed with Mozilla Firefox.
limon_977@hotmail.com
"...its has to be or not to be..."
>
>
>
>
>
Blog Archive
▼
2009
(8)
▼
March
(1)
Final day of my room make over...
►
February
(7)
Everything almost done hehehe (^^,) (day 7 - Feb 2...
Day 6 of renovation....
Day 5 of mr room renovation progress
Day 4 (Room renovation)
Day 3 (Room renovation)
Day 2 (room renovation) Feb 22, 2009
Day 1 (room renovation) Feb 21,2009
Links...
>
Feedjit Live Blog Stats
March 04, 2009
Final day of my room make over...
Posted by < de pages >
Finishing layer by painting the actual color.
I'm using Nippon paint. 2 color... liberty gray (ceiling & partition wall) super white (existing wall)
Installing the lights & fans.
Above & below my dress room.
Above & below my bed room area (^^,)
TOP
February 28, 2009
Everything almost done hehehe (^^,) (day 7 - Feb 28, 2009)
Posted by < de pages >
Starting applying the undercoat paint after smothering the surface of the compound area by using a sandpaper.
Its also takes half day to complete the process of undercoating the area.
The out come of the day (above & below image) after completing 6 layers of undercoat paint.
TOP
February 27, 2009
Day 6 of renovation....
Posted by < de pages >
Merely complete of construction.
Just applying the compound to cover any gaps & joint.
Outcome in end of the day...
TOP
Day 5 of mr room renovation progress
Posted by < de pages >
Building up a wall frame for room partition.
Fixing up the wall with gypsum board.
A small room for walk in wardrobe has been established... hehehe (^^,)
TOP
February 25, 2009
Day 4 (Room renovation)
Posted by < de pages >
Almost completed layering the ceiling...
Plastering the joint with compound after applying the joint tape just to cover the joint and
any gaps in between each ceiling board.
Still not completed yet with the plastering the joint at the end of the day...
and also still a lot more to complete.
TOP
February 24, 2009
Day 3 (Room renovation)
Posted by < de pages >
Still in progress installing the lower layer of the lower ceiling with gypsum board.
Yet still lots more to complete... (
batah jua kan siap ani eh... hehehe sabar...
) (^^,')>
TOP
February 23, 2009
Day 2 (room renovation) Feb 22, 2009
Posted by < de pages >
Installing new wiring... (existing one, all cut off. )
Still continuing fixing for lower ceiling.
Wiring + fixing for lower ceiling takes an entire day to complete...
The outcome for entire day... (^^,)>
TOP
February 21, 2009
Day 1 (room renovation) Feb 21,2009
Posted by < de pages >
Ripping off the existance ceiling. (the ceiling was made from cement board)
Still ripping off the ceiling. It takes the whole morning to complete.
Done by 2 person one below (holding) and one above knocking down the ceiling.
Starting fixing for the lower ceiling.
(picture above and below)
TOP